Fibre, towers, site power, ICT, and civil work across Uganda. Some completed jobs stay off this list under NDA.
2024Turnkey survey, trenching, ducting, and joint splicing for a 180 km optical fiber backbone interconnecting Kampala CBD, Kololo, Nakasero, and Bugolobi with 99.99% link availability.
2025Design and erection of a 250kW rooftop PV solar array coupled with a 500kWh lithium-ion battery energy storage system (BESS) for continuous industrial manufacturing.
2023Structured Cat6A copper and multi-mode fiber cabling across 42 branch headquarters, integrated with Cisco SD-WAN routers and dual redundant ISP failover circuits.